Usually included
- Plumbing, electrical, low-voltage allowance, ventilation, AC rough-in and final system logic.
- Testing, balancing where applicable and ordinary handover information.
Bali
MEP in Bali is where basic residential construction often turns into a premium product. Cooling strategy, ventilation, controls, condensate drainage and commissioning change both capital cost and operating quality. This guide is for projects that need a more precise Bali-specific MEP planning range.
| Scenario | Area / basis | Specification | Planning range | Unit range | Important note |
|---|---|---|---|---|---|
| Basic villa MEP | 150-220 m² | Plumbing, electrical, bathroom exhaust, split AC and simple controls. | IDR 270M-770M | IDR 1.8M-3.5M / m² | Useful when the project wants practical comfort without premium HVAC. |
| Premium MEP and comfort package | 300-520 m² | Fresh air, mixed or ducted AC, controls, balancing, better service access and O&M records. | IDR 900M-3.12B | IDR 3.0M-6.0M / m² | Ceiling coordination and commissioning become critical at this level. |
Decide the comfort level before fixing ceilings and shafts.
Use the high band when the project expects fresh-air supply, ductwork, balancing or stronger maintenance access.
The cost guide is useful only when it is tied back to stage pages, checklists, mistakes, and the work sequence for execution control.
Fan-assisted supply or extract air system used when natural airflow is not enough.
Cooling system with separated indoor and outdoor units connected by refrigerant and drain lines.
Cooling system distributing conditioned air through ducts, plenums, and air terminals.
Drainage path that removes water formed during cooling operation.
Measurement and adjustment of air volumes so a ventilation system performs as intended.
Balanced ventilation system that exchanges indoor and outdoor air with heat or energy recovery.
As soon as the project begins comparing ventilation and cooling options, multiple bathroom clusters, or premium guest comfort targets.
Leaving HVAC and ventilation decisions until after ceilings, joinery and wet-area layouts are already locked.