Usually included
- Pool shell, waterproofing, basic finish, pumps, filters, lighting allowance and testing.
- Bali location assumptions for wet climate and outdoor maintenance exposure.
Bali
A Bali pool should be budgeted as its own construction package. Pool shell, waterproofing, overflow logic, lighting, filtration and service access follow a different cost curve from the main villa. This page helps keep those items visible before the pool becomes a late add-on.
| Scenario | Area / basis | Specification | Planning range | Unit range | Important note |
|---|---|---|---|---|---|
| Small skimmer pool | 18-28 m² | Simple geometry, standard tile, compact equipment set and straightforward access. | IDR 108M-280M | IDR 6.0M-10.0M / m² | A useful baseline for compact villas where the pool is not the main feature. |
| Villa pool with stronger detailing | 32-50 m² | Better waterproofing, feature lighting, larger pumps and more demanding edge details. | IDR 256M-625M | IDR 8.0M-12.5M / m² | Machine-room access and drainage should be fixed before architectural finishes are approved. |
Compare the pool separately before you compare whole-villa offers.
If the project wants an overflow edge or premium finish, move straight to the upper band and review commissioning scope.
The cost guide is useful only when it is tied back to stage pages, checklists, mistakes, and the work sequence for execution control.
Barrier systems preventing water penetration.
Floor fall geometry directing water to drains.
Integrated testing and handover readiness checks.
Handover document set explaining how installed systems should be operated, serviced, and maintained.
No. Pool cost behaves differently from the house structure and interior. Keeping it separate makes the budget more transparent and protects against underpriced waterproofing and equipment packages.
Waterproofing and overflow-detail mistakes are usually the most expensive because repairs often require breaking finished surfaces after the pool is already visually complete.