Usually included
- Stage logic for structure, MEP, testing, documentation, and handover control.
- Regional multiplier relative to the current BuildBudgeter base model.
Singapore
Singapore cost comparisons should not be reduced to a single m2 number. Coordination, compliance, productivity, MEP density, testing, and handover documentation can be more important than the architectural area. This page keeps those items visible.
| Scenario | Area / basis | Specification | Planning range | Unit range | Important note |
|---|---|---|---|---|---|
| Small controlled fit-out baseline | 100-160 m² | High documentation expectation, standard MEP, controlled handover package. | IDR 1.05B-3.85B | IDR 10.5M-24.0M / m² | Small areas can carry high fixed compliance and coordination cost. |
| Standard residential planning band | 250 m² | Higher coordination, stronger MEP documentation, testing and handover records. | IDR 3.10B-6.50B | IDR 12.4M-26.0M / m² | Use as planning range before detailed compliance review. |
| Premium technical scope | 400 m² | Premium finishes, higher MEP density, automation, commissioning, O&M manual discipline. | IDR 5.80B-11.20B | IDR 14.5M-28.0M / m² | Documentation and systems coordination should be budgeted, not treated as overhead. |
Use the range to compare Singapore against other locations, then run the calculator and inspect MEP, commissioning, and handover stages.
The model uses IDR as base display for consistency; switch display currency in the interface where available.
The cost guide is useful only when it is tied back to stage pages, checklists, mistakes, and the work sequence for execution control.
A quality control plan that lists inspections, tests, acceptance criteria, hold points and required records for a work package.
Integrated testing and handover readiness checks.
Handover document set explaining how installed systems should be operated, serviced, and maintained.
Data, security, automation, and communication wiring.
The planning multiplier reflects stricter coordination, documentation, productivity, and systems control assumptions. It is still a planning band, not a local tender.
MEP rough-in, engineering finishes, commissioning, and handover documentation should be reviewed before accepting a low total number.