Construction glossary linked to cost, quality and execution

This glossary is built as a connected knowledge layer for the calculator, construction stages, checklists, mistake-cost pages and work sequences. It covers HVAC, ventilation, waterproofing, structure, finishing, commissioning, handover and material-consumption terms with longer articles designed for both decision-making and search visibility.

61 linked terms across budgeting, buildability, HVAC, waterproofing, and handover.

Featured topic clusters

Work sequence, method statements, and material norms

Terms that connect construction stages to executable work order, hold points, productivity, temporary works, inspection plans, and material consumption.

Key terms: Work sequence , Method statement , Material consumption rate , Productivity rate , Hold point , Inspection and test plan , Temporary works
Related stages: Pre-construction & site preparation , Foundation & underground works , Structure & vertical envelope , Engineering rough-in , Commissioning & testing

Featured glossary articles

Work sequence

The planned order in which construction activities are executed so each trade has the right access, information and inspection status.

Method statement

A document that explains how a construction activity will be carried out, controlled, inspected and made safe.

Material consumption rate

A planning quantity of material expected per unit of work, such as kg per m², m³ per m² or linear meters per room.

Hold point

A required pause in the work sequence where an inspection or approval must happen before work continues.

Split air conditioner

Cooling system with separated indoor and outdoor units connected by refrigerant and drain lines.

Site drainage

Ground-level water management around the building.

Commissioning

Integrated testing and handover readiness checks.

As-built documentation

Final record set showing what was actually installed, routed, adjusted, and handed over on site.

Opening flashing

Water-shedding detail around windows and exterior doors that keeps rain out of the wall assembly.

Substrate preparation

Cleaning, leveling, priming, moisture control, and compatibility checks before finish materials are installed.

Load path

Continuous route by which gravity, wind, and other forces move through the structure into the foundation.

Concrete cover

Distance between reinforcement and concrete surface that protects steel and helps structural performance.

A–Z

All A (3) B (1) C (8) D (2) E (3) F (7) G (1) H (1) I (2) J K L (3) M (5) N O (2) P (5) Q R (3) S (10) T (2) U V W (3) X Y Z

By stage

All stages Pre-construction & site preparation (8) Foundation & underground works (20) Structure & vertical envelope (15) Roof & exterior shell (8) Engineering rough-in (15) Waterproofing & wet areas (16) Envelope completion (5) Finishing works (10) Facade & site works (13) Engineering finishes (14) Commissioning & testing (18) Handover & close-out (9) Commercial placeholder Pool works (2)

Terms